Sangita New Building
The new buildings at Sangita are really coming along. The work on the main building has stopped temporarily due to lack off funds but the pods for the children to sleep in are still developing as is the volunteers house.
This is the main building so far. When you walk through the front door you can turn left into the dining area or right into the play area. Off the dining room is a food preparation area which leads into a big kitchen and utility area. The room next to this is a room to iron and prepare the children’s school uniforms. There are 40 uniforms to get ready each day
- Main Building
- Dining Room
- Kitchen
- Sleeping Pods
- Bedroom
- Volunteers House
- Kitchen area inside the volunteers house
- Volunteers bedroom area
The children’s sleeping area is to the left off the main building. This is one building which is split into 3 or 4 pods. In each pod is the sleeping area, toilets and washing facilities. Each pod can house up to 20 – 25 children.
The volunteers house is where people who come to visit the orphanage can stay. There is a kitchen/dining/living area and 2 bedrooms which have their own toilet and wash facilities.
The new orphanage looks amazing. Hopefully they will be able to find the money to get the rest of the buildings finished so the children can move in. They need about $100,000 to be able to complete the project.
Date posted: Saturday, August 8th, 2009 8:17 am | Under category: Uncategorized
RSS 2.0 | Comment | Trackback








Every confidence that everything thats needed will be provided,it may take a wee bit longer than we all want but god will provide. The buildings are looking fantastic and moved on a great deal since our last set of photos.
Davis / Lilias
Its really good to see the photos of the inside of the orphanage, its really coming on! Its a shame it cant be finished off yet, we’ll need to have a fundraiser when you guys get back and try and raise some money for them!
Hope you are all having a great trip,
Monica